Powerful Services
With over 45 years of experience in boiler engineering and system construction, AFYCO is a competent partner for all boiler operators. The current technical issues such as runtime-optimized approaches, plant security and plant flexibility have a long tradition with us. We offer our power plant customers in the fields of energy, waste incineration and the process industry individual solutions for individual problems. And that as a complete package, from engineering to the delivery and assembly of boiler components.
Our know-how extends to power plant installations and the various types of firing systems for all conventional fuels as well as bio, waste and substitute fuels of any size.
CONSTRUCTION OF NEW STEAM GENERATORS AND THEIR COMPONENTS:
- Concept, basic and detail engineering / project planning
- Acquiring, manufacturing and supplying components
- Shutdown planning
- Dismantling and re-assembly
- Installation monitoring / site supervision / site management
- Installation
- Expediting
- Quality assurance / manufacturing supervision
- Placing into service
- Staff training
- Documentation – preparation of operating manuals
- Spare and wear parts management
- Preparations for acceptance inspections by official agencies and experts
OUR SERVICE FOR THE FOLLOWING COMPONENTS:
- Boiler pressure parts
- Burners and firing systems
- Grate firing equipment
- Pulverizers
- Feeders / coal feeding
- Ash extractors
- Flue gas cleaning
- Turbines
- Ash and coal dust conveyors
- Automation and control engineering equipment
- Instrumentation & control equipment-Gas and steam turbines
- Piping and duct construction
- Valves & fittings
PLANT AND COMPONENT OPTIMIZATION:
- Technical consultation and feasibility studies
- Display / calculation / process data assessment
- Recording and evaluating operating data
- Recording damage / fault analysis / process optimization
- Power and energy optimization
- Efficiency-raising steps
- Rehabilitation and revamping
- Retrofitting, extensions, development
- Adjusting to official requirements/tighter standards
- Adjusting to changed deployment conditions
- Use of new technologies/replacement of components
- Modifications for other fuels to be used
Our facilities make us less reliant on others for:
- Pressure parts and headers
- Coal mills, coal burners, conveying equipment